Pricing
Hosting Pricing
Every hosting proposal is customised to your equipment. Here's what goes into your quote.
What affects your price
- Miner models and power consumption
- Number of units
- Cooling technology: air, hydro or immersion
- Contract length
- Installation and service level requirements
Get your customised quote
Share your equipment details and we'll respond with a clear, itemised proposal.
Current hosting rates
Where a rate isn't listed, it depends on your equipment and contract — request a quote for an exact figure.
| Service | Rate |
|---|---|
| Air-cooled hosting | Request a quote |
| Hydro-cooled hosting | Request a quote |
| Immersion-cooled hosting | Request a quote |
| Installation / setup | Request a quote |
What belongs in a hosting quote
Hosting pricing is quote-only. Use these components to distinguish recurring operating costs from one-time charges, refundable funds, and expenses that arise only when work is needed.
| Component | What it covers | How it's quoted |
|---|---|---|
| Energy per kWh | Electricity used by the miner and any additional electrical loads assigned under the billing method. Miner consumption and total billable consumption are not necessarily identical. | Confirm the quoted energy basis, metering boundary, billing period, and whether cooling or other facility overhead is included. Ask whether charges follow measured usage or an agreed power allocation. |
| Cooling type | Heat removal using air, a compatible liquid loop, or immersion equipment. Each method has different infrastructure, compatibility, and servicing requirements. | Ask whether cooling is included or separately charged. Identify any equipment adaptation, coolant, pump, dry-cooler, or other cooling-related costs before comparing alternatives. |
| Installation and setup | Receiving checks, equipment identification, placement, electrical connection, network configuration, and initial testing. Specialized cooling may require additional preparation. | Request an itemized one-time charge and its scope. Clarify whether configuration changes, replacement-machine installation, or recommissioning would trigger another charge. |
| Maintenance and repairs | Routine checks, fault diagnosis, cleaning, and repair labor. Preventive maintenance and corrective repair are different services and may be billed differently. | Identify included tasks, separately billable labor, approval requirements, and exclusions. Ask how diagnosis is charged if a repair is declined or proves uneconomical. |
| Parts | Replacement components such as fans, power supplies, control boards, and hashboards. Compatibility, availability, and warranty status affect replacement decisions. | Confirm whether parts are included, supplied at a separately approved price, or customer-provided. Ask about sourcing fees, warranty handling, and ownership of removed components. |
| Shipping and logistics | Inbound delivery, packing, freight insurance, repair shipments, and eventual return shipping. Carrier charges are separate from equipment handling unless expressly bundled. | Request responsibility for each shipping leg, insurance arrangements, receiving requirements, and outbound handling charges. Establish who files claims for transit damage. |
| Contract term | The commitment period and rules governing renewal, pricing changes, early exit, equipment removal, and any minimum billing obligation. | Compare the complete commitment, not just a monthly estimate. Ask which charges can change, what notice applies, and what becomes payable upon early termination. |
| Deposits | Funds collected before service that may act as security or advance payment. A refundable deposit is different from a nonrefundable setup fee. | Confirm the amount in the quote, its purpose, permitted deductions, refund conditions, and whether it is credited toward invoices. Keep deposits separate from operating expenses. |
Worked example: estimating miner electricity consumption
For an illustration, assume an S21 operates at a constant 3,500 W for a 30-day month. This is a calculation assumption, not a specification for every S21 variant or operating mode. The formula is watts × 24 × 30 ÷ 1000 × rate. Multiplying watts by operating hours gives watt-hours; dividing by 1,000 converts that result into kilowatt-hours. Here, 3,500 × 24 × 30 ÷ 1000 = 2,520 kWh.
Apply an illustrative test electricity rate of $0.07/kWh: 2,520 × 0.07 = $176.40 per month. This rate is only an arithmetic input—not our price, an available hosting rate, or a hosting quote. The result represents electricity for the assumed miner load alone. It does not establish an all-in monthly bill and does not include separately billed cooling, setup, repairs, parts, shipping, or other contract charges.
Actual consumption depends on operating hours, firmware settings, power mode, equipment condition, and environmental conditions. Use measured input power when available, and replace the 30-day assumption with the billing period you want to evaluate. If the quoted billing basis includes additional electrical loads, account for those separately rather than silently treating miner wattage as total consumption. Use the hosting cost calculator to organize your estimate, then reconcile the inputs and exclusions against a written quote.
How to compare hosting quotes on equal terms
Normalize the assumptions before comparing totals. A lower headline figure may describe a narrower service scope, a different consumption basis, or a longer financial commitment.
- 01
Use the same equipment and operating assumptions
List the exact miner variant, quantity, intended power mode, cooling requirements, and expected operating hours. Give each estimate the same billing period. Do not compare one quote based on nominal power with another based on a higher configured power limit without adjusting the consumption assumptions.
- 02
Separate recurring costs from cash due upfront
Create distinct totals for monthly charges, nonrefundable startup expenses, and refundable deposits. For comparison, spread setup expenses across your planned hosting period, while still showing their actual payment timing. Deposits affect available cash but should not automatically be counted as a permanent expense.
- 03
Check inclusions line by line
Mark each component as included, separately billed, excluded, or unresolved. Pay particular attention to cooling electricity, maintenance labor, replacement parts, and outbound handling. An unresolved item is not a zero-cost item. Request written clarification rather than assuming that a broad label such as maintenance covers every repair.
- 04
Read the billing and interruption rules
Determine how invoices treat partial months, equipment shutdowns, repairs, and power interruptions. Ask whether any minimum charges continue when a miner is not hashing. Check how meter readings, agreed allocations, credits, and invoice disputes are handled; these details can change the effective cost without changing the headline energy basis.
- 05
Compare the full commitment and downside
Review renewal terms, price-adjustment clauses, early-exit obligations, and equipment-release procedures. Then test a lower-revenue scenario alongside your base estimate. Mining revenue is not guaranteed. A hosting arrangement should be evaluated against its payment obligations even when network difficulty, market conditions, or equipment faults reduce expected proceeds.
Build a budget that separates certainty from contingencies
A useful budget has three layers: contracted charges, consumption-dependent charges, and contingent expenses. Contracted charges come from the written agreement. Consumption-dependent charges require explicit assumptions about power and operating time. Contingent expenses include repair labor, parts, and unplanned freight. Keep those categories visible rather than compressing everything into one supposedly precise monthly figure. That makes it easier to identify whether a difference between quotes comes from pricing, scope, or simply a different assumption.
For repairs, establish a decision process before assigning a budget allowance. Specify who can authorize diagnosis, whether there is a spending limit, and when a separate repair estimate is required. Compare the proposed repair expense with the machine's remaining usefulness and expected operating economics, not only its original purchase price. Avoid treating a repair reserve as a predicted invoice: it is money set aside for uncertainty, and actual expenses may be lower or higher.
Finally, distinguish operating cost from cash flow. An initial payment can combine setup charges, advance billing, and a deposit even though those items have different accounting and refund treatment. Track when each amount is due and what happens when service ends. Include equipment retrieval and return freight in an exit scenario so that a monthly comparison does not hide obligations payable later.
Estimate your energy cost
Test your own rate per kWh. Illustration only — not a Teraminerhosting price.
Formula: watts × 24 × 30 ÷ 1000 × rate (30-day month = 720 hours), × uptime.
- Total load
- 3.50 kW
- Energy per month (720 h)
- 2,520 kWh
- Per day
- $5.88
- Per month (30 days)
- $176.40
- Per year
- $2,146.20
- Per miner, per month
- $176.40
Illustration only, using the rate you enter — this is not a Teraminerhosting price.
Get an exact quote for this setupPricing questions
Why don't you publish a fixed rate?
Costs vary with miner type, quantity, power and cooling. A tailored quote is more accurate than a generic rate card.
Are there setup fees?
Any setup or installation fees are itemised clearly in your quote.
How is power billed?
Billing structure is set out in your hosting agreement and quote.
How should I estimate electricity for a partial billing month?
Replace the monthly hours assumption with the hours you expect the miner to operate: watts × operating hours ÷ 1,000 gives estimated kWh. Then apply the electricity input used in your comparison. This estimates consumption, not necessarily the invoice. The agreement may specify minimum charges, advance billing, or a different treatment of partial periods.
Does a lower-power operating mode always reduce total hosting cost?
Lower measured power generally reduces miner electricity consumption over the same operating period, but it may also reduce hashrate. The invoice effect depends on whether billing follows measured consumption, allocated power, or another agreed basis. Compare both consumption and expected output, and confirm whether changing the operating mode requires approval or affects other charges.
How can I check whether cooling electricity is being counted twice?
Identify the measurement boundary behind each charge. If an energy figure already includes cooling overhead, adding a second allowance for that same electricity would overstate the estimate. A separate cooling service fee is not necessarily duplicate electricity billing, however. Ask for a written distinction between miner energy, cooling energy, and infrastructure or service charges.
What documentation should accompany a separately billed repair?
Ask for the fault diagnosis, proposed work, labor basis, parts description, and any shipping expense before authorizing the repair. Clarify whether diagnosis remains payable if you decline the work. After completion, retain the approval, invoice, and available test results so you can distinguish the original repair from a later fault or warranty claim.
Ready to Host Your ASIC Miners?
Share your equipment details and our team will prepare a customised hosting quotation.
